Laying Engineering Bricks During Winter

It is always preferable to save engineering brickwork projects for the dry, warmer months. This isn't always possible, though. If you have to work in the winter, you need to get used to the weather. This will help ensure that the work continues to be of high quality. Since we are the best engineering bricklayers in West Yorks, we would like to provide some advice on this.


All materials should ideally be stored in a dry location. Make sure that the ground is covered. It is also wise to ensure that the Engineering Bricks are at a comfortable temperature before laying them. If they are too cold, the mortar will cool when it comes into contact with them, which could weaken the bond and reduce its strength.


What is the Issue?

The main problem is the mortar. Whether you use sand and cement or a lime mix, water will also need to be added. The dampness can freeze and extend when it is cold. As a result, the strength and stability of the engineering brick bonds might be affected. It also affects how watertight they are.


If you work in the winter, you need to keep the mortar from freezing. If this happens, you have to throw it out and make a new mix. Some may suggest using anti-freezing agents, but this is against the law in the UK. The best strategy is to make mortar in smaller batches more frequently.



Look at the Temperature

The NHBC provides accurate temperature guidance. According to them, there shouldn't be any issues as long as the temperature outside is above 4 degrees Celsius. However, if it falls below this level, Blue Engineering Brick layers must adapt. The mortar, for instance, needs to remain at a temperature of four degrees. They will also need to keep surfaces free of ice and frost. Even if newly constructed masonry is to be insulated, blankets may be required.


If the temperature drops below 2 degrees Celsius, the project may need to be halted, but work can continue if it stays above 4 degrees Celsius.

Take Care With Materials

Maintaining the mortar's temperature above 4 degrees Celsius throughout the winter is crucial, so be careful with the materials. Frost damage should also be checked on other materials. Dry wet engineering bricks before laying them to stop the moisture from freezing.


All materials should ideally be stored in a dry location. Make sure that the ground is covered. It is also wise to ensure that the engineering bricks are at a comfortable temperature before laying them. The mortar will cool when it comes into contact with them assuming they are excessively chilly, which could think twice about bond and strength.


Talk to Reliable Engineering Brick Layers in the UK

We at Best engineering Brickwork are aware of the challenges posed by working in damp and cold environments. When necessary, we make every effort to guarantee that the work will continue to be of high quality. However, we will always inform customers of any concerns.